Regulation
Who is licensed to launch, operate satellites and sell imagery, the deadlines they face, and new rules you can comment on
Open for Comment
- Wireless Telecommunications Bureau Establishes a New Docket and the Process for Comment on Eligible Space Station Operator Transition PlansFCC notice · closes 30 Nov 2026 (20 days left)
- Unleashing Unlicensed Spectrum for Direct-to-DeviceFCC proposed rule · closes 7 Dec 2026 (27 days left)
- Conditional Expected Casualty Exception for Failures Resulting in an Uncontrolled Atmospheric ReturnFAA proposed rule · closes 9 Dec 2026 (29 days left)
- Flight Safety Limits Objectives Burden Reducing ClarificationFAA proposed rule · closes 9 Dec 2026 (29 days left)
- Flight Abort Burden Reducing Clarification on End of Flight Safety LimitsFAA proposed rule · closes 9 Dec 2026 (29 days left)
Comments go to the agency through the link on each document (usually regulations.gov or the FCC's filing system).
Constellation Deployment Deadlines
| Licence | Deadline | Required | Active today |
|---|---|---|---|
Starlink Gen1 SpaceX · FCC | 29 Mar 2027 all in service | 4,408 | 11,201 |
Kepler Gen1 (Ku band) Kepler Communications · FCC | 19 Nov 2027 all in service | 140 | — |
Starlink Gen2, second 7,500 SpaceX · FCC | 1 Dec 2028 half in service | 3,750 | 11,201 |
Starlink Gen2, first 7,500 SpaceX · FCC | 1 Dec 2028 half in service | 3,750 | 11,201 |
Amazon Leo Gen1 (Project Kuiper) Amazon Leo · FCC | 30 Jul 2029 all in service | 3,232 | 391 |
BlueBird direct-to-cell constellation AST SpaceMobile · FCC | 2 Aug 2030 half in service | 124 | — |
Starlink Gen2, second 7,500 SpaceX · FCC | 1 Dec 2031 all in service | 7,500 | 11,201 |
Starlink Gen2, first 7,500 SpaceX · FCC | 1 Dec 2031 all in service | 7,500 | 11,201 |
Amazon Leo Gen2 and polar Amazon Leo · FCC | 10 Feb 2032 half in service | 2,252 | 391 |
BlueBird direct-to-cell constellation AST SpaceMobile · FCC | 2 Aug 2033 all in service | 248 | — |
Amazon Leo Gen2 and polar Amazon Leo · FCC | 10 Feb 2035 all in service | 4,504 | 391 |
FCC licences require half of the authorised satellites in service within six years and all of them within nine, or the licence shrinks to what is in orbit. "Active today" is the whole constellation, which can span several licences.
Licences and Authorisations
| Licensee and licence | Regulator | Reference | Satellites | Granted | Expires or deadline | Status | Source |
|---|---|---|---|---|---|---|---|
| AST SpaceMobile BlueBird direct-to-cell constellation Commercial direct-to-device service using AT&T, Verizon and FirstNet spectrum. Half the satellites by August 2030, all by August 2033. | FCC Space station licence | — | 248 | 21 Apr 2026 | 2 Aug 2033 all satellites in service | Active | Via Satellite ↗ |
| Amazon Leo Amazon Leo Gen2 and polar · constellation 3,212 Gen2 and 1,292 polar satellites, on top of Gen1. | FCC Space station licence | SAT-LOA-20211104-00145 | 4,504 | 10 Feb 2026 | 10 Feb 2035 all satellites in service | Active | FCC order DA 26-553 ↗ |
| SpaceX Starlink Gen2, second 7,500 · constellation Brings the authorised Gen2 system to 15,000 satellites. Half of them must be in service by 1 December 2028 and the rest by December 2031. | FCC Space station licence | DA 26-36 | 7,500 | 9 Jan 2026 | 1 Dec 2031 all satellites in service | Active | Broadband Breakfast ↗ |
| SpaceX Starlink Gen1 over India · constellation Valid for five years or until the Gen1 satellites reach end of life, whichever is earlier. Service also needs spectrum from the government. | IN-SPACe Satellite service authorisation | — | 4,408 | 8 Jul 2025 | 8 Jul 2030 | Active | The Week (PTI) ↗ |
| SpaceX Starlink satellite internet in India · constellation Third GMPCS licence after Eutelsat OneWeb and Reliance Jio. Date is when it was reported. | DoT Satellite service licence (GMPCS) | GMPCS | — | 6 Jun 2025 | — | Active | Outlook Business ↗ |
| Blue Origin New Glenn Part 450 licence valid for five years. | FAA Launch licence | — | — | 27 Dec 2024 | — | Active | Spaceflight Now ↗ |
| SpaceX Starlink direct to cell, with T-Mobile · constellation Supplemental coverage from space on Gen2 satellites, using spectrum leased from T-Mobile, on a secondary basis. | FCC Direct-to-device authority | DA 24-1193 | — | 26 Nov 2024 | — | Active | Telecommunications Law Professionals ↗ |
| Varda Space Industries W-series capsules First Part 450 reentry licence. Changed in 2025 so identical W-series reentries need no new approval through 2029. | FAA Reentry licence | VOL 24-130 | — | 14 Feb 2024 | 14 Feb 2029 | Active | FAA licence VOL 24-130 ↗ |
| Spire Global Hubble 1, 2 and 3 Small-satellite licence under the FCC's streamlined process. | FCC Space station licence | SAT-LOA-20230924-00232; call sign S3182 | 3 | 16 Jan 2024 | — | Active | FCC public notice DA 24-59 ↗ |
| Sidus Space LizzieSat Panchromatic and shortwave infrared imaging. Date is when it was announced. | NOAA Remote sensing licence | Tier 1 | — | 3 Jan 2024 | — | Active | ExecutiveBiz ↗ |
| Satellogic Aleph-1 constellation · constellation Came with moving satellite operations to US staff and ground stations. Date is when it was announced. | NOAA Remote sensing licence | — | — | 22 Nov 2023 | — | Active | SatNow ↗ |
| Eutelsat OneWeb OneWeb over India · constellation First IN-SPACe authorisation for satellite broadband. Commercial service starts once spectrum is allocated. | IN-SPACe Satellite service authorisation | — | — | 21 Nov 2023 | — | Active | Eutelsat press release ↗ |
| United Launch Alliance Vulcan Centaur from SLC-41 Licence under the old Part 415/417 rules, which all ended on 9 March 2026. Vulcan flights continue under a Part 450 licence. | FAA Launch licence | LLO 23-128 | — | 6 Jul 2023 | 9 Mar 2026 | Superseded | FAA licence LLO 23-128 ↗ |
| SpaceX Starship-Super Heavy Modified for each new flight profile; revision 2 (March 2024) covered Flight 3. | FAA Launch licence | VOL 23-129 | — | 14 Apr 2023 | 14 Apr 2028 | Active | FAA licence VOL 23-129 Rev. 2 ↗ |
| Maxar Technologies WorldView satellites, non-Earth imaging Allows Maxar (now Vantor) to sell images of other objects in space. Date is when it was announced. | NOAA Remote sensing licence | — | — | 5 Dec 2022 | — | Active | Maxar press release ↗ |
| SpaceX Starlink Gen2, first 7,500 · constellation Partial grant of the 29,988 satellites SpaceX asked for. Deployment deadlines are for the whole Gen2 system, as set in the January 2026 order. | FCC Space station licence | FCC 22-91 | 7,500 | 1 Dec 2022 | 1 Dec 2031 all satellites in service | Active | Via Satellite ↗ |
| Skyroot Aerospace Vikram-S, mission Prarambh First authorisation of a private Indian launch. Vikram-S flew on 18 November 2022. | IN-SPACe Launch authorisation | — | — | 16 Nov 2022 | — | Completed | Aviation & Defence Universe ↗ |
| Lynk Global Lynk satellite-to-phone system First FCC licence for a commercial satellite-to-phone service. Service is outside the US. | FCC Space station licence | — | 10 | 16 Sept 2022 | — | Active | Urgent Communications ↗ |
| Dhruva Space Satellite orbital deployer on PSLV-C53 POEM One of IN-SPACe's first two authorisations of private payloads. | IN-SPACe Payload authorisation | — | — | 24 Jun 2022 | — | Completed | The Tribune ↗ |
| Digantara ROBI proton dosimeter on PSLV-C53 POEM One of IN-SPACe's first two authorisations of private payloads. | IN-SPACe Payload authorisation | — | — | 24 Jun 2022 | — | Completed | The Tribune ↗ |
| Albedo Very low Earth orbit imaging satellites Allows sale of 10 cm visible imagery, the sharpest NOAA had licensed. Date is when Albedo announced it. | NOAA Remote sensing licence | Tier 3 | — | 14 Dec 2021 | — | Active | SpaceNews ↗ |
| Rocket Lab Electron from Wallops LC-2 Licence under the old Part 415/417 rules, which all ended on 9 March 2026. Electron flights continue under a Part 450 licence. | FAA Launch licence | LLO 20-120 | — | 17 Aug 2020 | 9 Mar 2026 | Superseded | FAA licence LLO 20-120 Rev 4 ↗ |
| Amazon Leo Amazon Leo Gen1 (Project Kuiper) · constellation Granted as 3,236 satellites, later 3,232. In June 2026 the FCC refused to move the 30 July 2026 half-way deadline but waived its automatic cut: satellites not in service by then lose priority until March 2028. | FCC Space station licence | FCC 20-102; call sign S3051 | 3,232 | 30 Jul 2020 | 30 Jul 2029 all satellites in service | Active | FCC order DA 26-553 ↗ |
| SpaceX Falcon 9 and Falcon Heavy from LC-39A Licence under the old Part 415/417 rules, which all ended on 9 March 2026. Falcon flights continue under a Part 450 licence. | FAA Launch licence | LLO 19-110 | — | 15 Feb 2019 | 9 Mar 2026 | Superseded | FAA licence LLO 19-110 Rev 4 ↗ |
| Kepler Communications Kepler Gen1 (Ku band) Canadian-licensed system allowed to serve the US. | FCC Market access | FCC 18-162; call sign S2981 | 140 | 19 Nov 2018 | 19 Nov 2027 all satellites in service | Active | FCC order FCC 18-162 ↗ |
| SpaceX Starlink Gen1 · constellation Granted as 4,425 satellites; modified in 2021 to 4,408 satellites at 540-570 km. All must be in service by 29 March 2027. | FCC Space station licence | FCC 18-38 | 4,408 | 29 Mar 2018 | 29 Mar 2027 all satellites in service | Active | SpaceIntel Report ↗ |
| Eutelsat OneWeb OneWeb Gen1 · constellation UK-licensed system allowed to serve the US. In September 2022 the FCC allowed up to 49 satellites in two planes; the 6,372-satellite second phase is still deferred. | FCC Market access | FCC 17-77; DA 22-970; call sign S2963 | 720 | 22 Jun 2017 | — | Active | FCC order DA 22-970 ↗ |
| Orbit Connect India SES satellites over India Joint venture of Jio Platforms and SES. Approvals came in April and June 2024. | IN-SPACe Satellite service authorisation | — | — | — | — | Active | MediaNama (Reuters) ↗ |
New Space Rules and Notices
- 9 Nov 2026FAAProposed rule· Launch and reentryComments close 9 Dec 2026Conditional Expected Casualty Exception for Failures Resulting in an Uncontrolled Atmospheric Return
FAA proposes to amend its commercial space launch and reentry licensing regulations to streamline the licensing process and reduce regulatory burden for license applicants. Specifically, FAA proposes to allow a launch and reentry vehicle operator to protect against high consequence events during an uncontrolled atmospheric return by showing that there would be sufficient breakup of the vehicle to ensure protection against a single event expected to produce multiple casualties.
- 9 Nov 2026FAAProposed rule· Launch and reentryComments close 9 Dec 2026Flight Safety Limits Objectives Burden Reducing Clarification
FAA proposes to amend its commercial space launch and reentry licensing regulations to streamline the licensing process and reduce regulatory burden for license applicants. Specifically, FAA proposes to clarify the requirements for establishing flight safety limits that define when a vehicle operator must initiate flight abort.
- 9 Nov 2026FAAProposed rule· Launch and reentryComments close 9 Dec 2026Flight Abort Burden Reducing Clarification on End of Flight Safety Limits
FAA proposes to amend its commercial space launch and reentry licensing regulations to streamline the licensing process and reduce regulatory burden for license applicants. Specifically, FAA proposes to clarify the conditions under which a vehicle operator is not required to abort a flight.
- 9 Nov 2026FAAFinal rule· Launch and reentryTechnical Corrections of Commercial Space Transportation Regulations
This final rule contains technical corrections in FAA regulations.
- 5 Nov 2026FCCFinal rule· Satellites and spectrumModernizing Spectrum Sharing for Satellite Broadband
In this document, the Space Bureau (Bureau or we) within the Federal Communications Commission (Commission) updates the initial set of geostationary (GSO) satellite network reference links adopted in the Modernizing Spectrum Sharing for Satellite Broadband Report and Order (Order). Ensuring the GSO reference links appropriately reflect typical and widespread GSO satellite operations in the United States will promote efficient spectrum sharing among today's broadband satellite systems.
- 26 Oct 2026FCCNotice· Satellites and spectrumComments close 30 Nov 2026Wireless Telecommunications Bureau Establishes a New Docket and the Process for Comment on Eligible Space Station Operator Transition Plans
In this document, the Wireless Telecommunications Bureau (Bureau) establishes GN Docket No. 26-289, which is captioned "Eligible Space Station Operator Transition Plans for the Upper C- Band." This document also details the process for notice and comment on the eligible space station operators' initial Transition Plans. Stakeholder comments are due on November 30, 2026. All initial Transition Plans and responsive comments should be filed only in GN Docket No. 26-289.
- 19 Oct 2026FCCNotice· Satellites and spectrumWireless Telecommunications Bureau Seeks Comment on Preliminary Cost Catalog for Upper C-Band Incumbent Transition
In this document, the Wireless Telecommunications Bureau (Bureau) invites interested parties to comment on the Upper C-band Transition Preliminary Cost Catalog (Cost Catalog), which is attached as Attachment A. The Cost Catalog contains preliminary estimates of reasonable and necessary transition costs that eligible space station operators and incumbent earth station operators (collectively, incumbents) may incur as they transition out of 4.0-4.16 GHz to make 160 megahertz of mid-band spectrum available to 3.7 GHz Service licensees for flexible use throughout the contiguous United States. The Cost Catalog also includes the payment categories for incumbent earth station operators that elect lump sum reimbursement in lieu of actual cost reimbursement. In Upper C-band (3.98-4.2 GHz); Expanding Flexible Use of the 3.7 to 4.2 GHz Band, GN Docket Nos. 25-59 and 18-122, Report and Order, Order of Proposed Modification, and Order on Reconsideration, FCC 26-46 (July 24, 2026) (Upper C-band R&O), the Commission established that new 3.7 GHz Service licensees will reimburse incumbents for their reasonable and necessary relocation costs to transition out of 4.0-4.16 GHz and directed the Bureau to develop the Cost Catalog.
- 14 Oct 2026FAANotice· Launch and reentryNotice of Intent To Prepare a Programmatic Environmental Impact Statement (PEIS), Open Public Scoping Period, and Hold Public Scoping Meetings on the Proposed SpaceX Starship-Super Heavy Launch and Landing Operations at the Boca Chica Launch Site at Starbase, Texas and Expansion of Starship Landing and Expenditure Locations
In accordance with the National Environmental Policy Act of 1969, as amended (NEPA) and FAA Order 1050.1G, FAA National Environmental Policy Act Implementing Procedures, FAA is announcing its intent to prepare a PEIS analyzing Space Exploration Technologies Corp.'s (SpaceX) proposal to increase Starship-Super Heavy operations at the Boca Chica Launch Site at Starbase, TX and expand Starship landing and expenditure locations. Subsequent license modifications or renewals under 14 CFR part 400 are within the scope of the PEIS, and the issuance of temporary airspace closures associated with the Proposed Action are included in FAA's Federal Action. FAA is requesting comments concerning the scope and content of the PEIS. A Draft PEIS will be released for public review and comment at a later date.
- 5 Oct 2026FAAProposed rule· Launch and reentryOverpressure Blast Effects Analysis Burden Reducing Clarification
FAA proposes to amend its commercial space launch and reentry licensing regulations to streamline the licensing process and reduce regulatory burden for license applicants. Specifically, FAA proposes to amend the regulations to state that a far-field overpressure blast effects analysis required for license applicants does not need to account for members of the public in hypothetical locations.
- 5 Oct 2026FAAProposed rule· Launch and reentryLightning Hazard Mitigation Burden-Reducing Exception
FAA proposes to amend its commercial space launch and reentry licensing regulations to streamline the licensing process and reduce regulatory burden for license applicants. Specifically, FAA proposes to add an exception for compliance with lightning hazard mitigation requirements for certain licensed launch and reentry operations.
- 5 Oct 2026FAAProposed rule· Launch and reentryStreamlining Flight Safety Analysis Methodology Means of Compliance
FAA proposes to amend its commercial space launch and reentry licensing regulations to streamline the licensing process. Specifically, FAA proposes to alleviate regulatory burden for license applicants by consolidating information required for an operator's flight safety analysis.
- 5 Oct 2026FAAProposed rule· Launch and reentryDigital Modernization for Licensing Electronic Application Submissions
FAA proposes to amend its commercial space launch and reentry licensing regulations to allow for submission of license and permit applications and requests for waivers, alternative time frames, and safety element approvals through additional electronic methods.
- 5 Oct 2026FAAProposed rule· Launch and reentrySimplifying Physical Containment Requirements
FAA proposes to amend its commercial space launch and reentry licensing regulations to streamline the licensing process and reduce regulatory burden on operators. Specifically, FAA proposes to relieve the burden by specifying that, when using physical containment as a hazard control strategy, operators do not need to develop flight hazard areas in accordance with FAA's existing flight hazard area analysis requirements.
- 29 Sept 2026FAANotice· Launch and reentryOffice of Commercial Space Transportation; Notice of Intent To Prepare a Supplemental Environmental Impact Statement (SEIS) and Open a Public Scoping Period for the SpaceX Starship-Super Heavy Operations at Space Launch Complex 37 at Cape Canaveral Space Force Station, Cape Canaveral, Florida
In accordance with the National Environmental Policy Act of 1969, as amended (NEPA), FAA Order 1050.1G, FAA National Environmental Policy Act Implementing Procedures, and Department of War (DoW) and Department of the Air Force (DAF) NEPA Implementing Procedures, FAA is announcing its intent to prepare a Supplemental Environmental Impact Statement (SEIS) concerning Space Exploration Technologies Corp.'s (SpaceX) proposal obtain a modification to their existing vehicle operator license from the FAA to authorize commercial Starship-Super Heavy operations at Space Launch Complex 37 (SLC-37) at Cape Canaveral Space Force Station (CCSFS). This SEIS supports FAA's adoption of the Final Environmental Impact Statement for the SpaceX Starship-Super Heavy Cape Canaveral Space Force Station (2025 DAF EIS), EIS Identification Number: EISX-007-057-USF-1730277197. The proposed operations would include up to 76 Starship-Super Heavy launches and up to 152 landings per year (up to 76 Super Heavy Booster and up to 76 Starship vehicle landings), including return-to-launch-site (RTLS) and ocean landings. FAA is requesting comments concerning the scope and content of the SEIS. A Draft SEIS will be released for public review and comment later.
- 29 Sept 2026FAANotice· Launch and reentryNotice of Availability, Notice of Public Comment Period, Notice of Virtual Public Meeting, and Request for Comment on the Draft Environmental Assessment for Blue Origin New Glenn Cadence Increase at Space Launch Complex 36A, Cape Canaveral Space Force Station, Florida
In accordance with the National Environmental Policy Act of 1969, as amended (NEPA), DOT Order 5610.1D, DOT's Procedures for Considering Environmental Impacts, and FAA Order 1050.1G, FAA National Environmental Policy Act Implementing Procedures, the FAA is announcing the availability of and requesting comment on the Draft Environmental Assessment Blue Origin New Glenn Cadence Increase at Space Launch Complex 36A, Cape Canaveral Space Force Station, Florida (Draft EA).
- 28 Sept 2026FAANotice· Launch and reentryNotice of Availability on the Finding of No Significant Impact and Record of Decision for Relativity Terran R Launch Program, Cape Canaveral Space Force Station, Florida
In accordance with the National Environmental Policy Act of 1969, as amended (NEPA), DOT Order 5610.1D, DOT's Procedures for Considering Environmental Impacts, and FAA Order 1050.1G, FAA National Environmental Policy Act Implementing Procedures, FAA is announcing the availability of its Finding of No Significant Impact and Record of Decision (FONSI/ROD) for the U.S. Space Force (USSF) 2024 Final Supplemental Environmental Assessment for the Terran R Space Launch Program, Cape Canaveral Space Force Station (2024 Final SEA).
- 18 Sept 2026FAANotice· Launch and reentryNotice of Availability, Notice of Public Comment Period, and Request for Comment on the Draft Programmatic Environmental Assessment for Reentry Vehicle Operations in the Marine Environment
In accordance with the National Environmental Policy Act of 1969, as amended (NEPA), DOT Order 5610.1D, DOT's Procedures for Considering Environmental Impacts, and FAA Order 1050.1G, FAA National Environmental Policy Act Implementing Procedures, FAA is announcing the availability of and requesting comment on the Draft Programmatic Environmental Assessment for Reentry Vehicle Operations in the Marine Environment (Draft PEA). FAA is also requesting comment on proposed new categorical exclusions (CATEXs) as described in and substantiated by the Draft PEA.
- 8 Sept 2026FCCProposed rule· Satellites and spectrumComments close 7 Dec 2026Unleashing Unlicensed Spectrum for Direct-to-Device
The Federal Communications Commission (Commission or FCC) issues a Notice of Proposed Rulemaking proposes to expand opportunities for direct-to-device (D2D) communications by permitting certain unlicensed devices to communicate with satellites on a non-interference basis. Building on recent market growth and new industry investment in D2D technologies, the NPRM explores adding satellite allocations in specific unlicensed bands, clarifying that equipment may operate within spacecraft, and establishing a flexible regulatory framework that preserves incumbent operations while enabling continued innovation. The Commission seeks comment on technical, licensing, and policy considerations to support expanded D2D connectivity and ensure coexistence with existing services.
- 4 Sept 2026FAANotice· Launch and reentryNotice of Availability on the Final Tiered Environmental Assessment and Finding of No Significant Impact for SpaceX Starship Reentry Contingency Operations in the Pacific Ocean and Additional Starship Landing Trajectory
In accordance with the National Environmental Policy Act of 1969, as amended (NEPA), DOT Order 5610.1D, DOT's Procedures for Considering Environmental Impacts, and FAA Order 1050.1G, FAA National Environmental Policy Act Implementing Procedures, the FAA is announcing the availability of the Final Tiered Environmental Assessment and Finding of No Significant Impact/Record of Decision for SpaceX Starship Reentry Contingency Operations in the Pacific Ocean and Additional Starship Landing Trajectory (Final Tiered EA and FONSI/ROD).
- 25 Aug 2026FAANotice· Launch and reentrySiting New Spaceports and Use of Priority Airspace for Critical Space Launch Corridors
Under the leadership of President Trump and at the direction of Secretary Duffy and Administrator Bedford, the U.S. Department of Transportation (DOT) and the Federal Aviation Administration (FAA) are pursuing opportunities to ensure the United States global dominance in the commercial space transportation industry. The FAA is issuing this RFI to solicit public and industry input on two key transportation- related elements of President Trump's recently published 2026 National Space Transportation Policy (NSTP): siting a new spaceport and the development and use of priority airspace for critical space launch corridors.
Licences are chosen and checked by hand, because the FCC, FAA and NOAA licence lists can't be downloaded automatically; every row links to the official licence, order or announcement. Rules and notices come from the Federal Register (FCC, FAA, NOAA, Department of Commerce, NTIA and NASA) and update every Monday.